Paulding County, on the west side of metro Atlanta along US 278 and GA 92, has been one of the region's faster-growing residential counties as development pushes west from Cobb. Anchored by Dallas, the county seat, and Hiram, Paulding's growth is led by for-sale subdivisions and an increasing share of build-to-rent communities on land moving from rural to suburban. That greenfield residential development is squarely the work 2070 Construction is positioned to deliver from raw ground to finished pad.
Greenfield work in Paulding means the full horizontal sequence runs: land development permitting, clearing and grubbing on wooded parcels, mass grading and cut and fill, water and sewer installation, stormwater ponds and detention, roads, curb and gutter, sidewalks, and foundations. 2070 self-performs that full sequence under one contract, which matters most on the larger lot counts and longer schedules typical of Paulding subdivisions, where seams between separate grading, utility, and paving subs turn into schedule risk. For build-to-rent, 2070 has delivered the site plan review permitting path on Villas at Redan in Decatur.
Development in Paulding County runs through Paulding County's development review for unincorporated areas and through the cities of Dallas and Hiram for projects inside their limits. Each runs its own land disturbance and site permitting. 2070 manages the submittal and approval process directly — preparing the package with the civil engineer, responding to review comments, and carrying the permit through approval.
The terrain is Piedmont red clay, moisture-sensitive and prone to shrink and swell. Cut and fill balancing, structural fill import, and proper compaction are central to getting a Paulding site to finish grade and delivering a pad ready for foundations.
In Paulding County, 2070 Construction self-performs the full horizontal scope plus foundations and structural concrete: site development, grading and earthwork, underground utilities, stormwater and drainage, concrete and foundations, and permitting. For a developer building along the Dallas and Hiram corridor, that means one accountable contractor from permit to pad ready.
If you are developing in Paulding County, Dallas, or Hiram, send us the civil plans and we will return a scoped bid.